Dara Sakor Reflections · Video

Along Long Bay, from sea to land
the built-up coast and hills

Flying inland along the Long Bay axis: roofs and streets first, then the hills.

By Tian Sisuo Length 38 s Date 2026-11-05
38 s

Source: Aerial footage by Coastal City Development Group · shot 12 Aug 2026 · reposted by Tian Sisuo, sales director, Soksan Sakor Land Phase I

Short answer

Aerial footage from Coastal City Development Group's files, shot on 12 Aug 2026 and filed as "Long Bay axis, from sea to land": the drone moves slowly inland from the shore over rows of factory buildings (many with solar panels on the roof), blocks and roads, with forested hills in the distance. Silent, 38 s.

What the footage shows

The 38-second flight starts at the shore and moves slowly inland. From 0:00, in the distance, are the buildings and roads of the Long Bay area; from 0:19 the camera keeps moving inland; from 0:28 forested hills open up behind the buildings, and the film stops in front of the hills. It is silent, with no captions or marks.

It was filmed on 12 August 2026 and comes from Coastal City Development Group's official files, filed as "Long Bay axis, from sea to land", shown as released. For a rough sense of how sea and hills sit relative to each other, this is a distant-view reference; the built-up area shown is outside the Phase I boundary. For Phase I land itself, see Phase I land prices.

Chapters

tap a time to jump

  1. Buildings and roads by the sea
  2. Solar roofs and factories
  3. Forested hills behind

Transcript

Silent aerial footage with no narration; the chapter notes below serve as the text of the film.

About the footage

FAQ

Is Dara Sakor the same place as Qixinghai (七星海)?
Yes. 达拉沙果 is now the standard Chinese name, matching Dara Sakor in English, តារាសាគរ in Khmer and the highway signs. 七星海 (Qixinghai), seen in some of the group's films, is the former name and is left as it appears in the original.
Is this built-up area Phase I?
No. These are finished blocks around Long Bay in Dara Sakor; Phase I itself is still land being levelled.
Who made this, and can I share it?
It is official footage from Coastal City Development Group, the developer and operator of Dara Sakor, reposted here so it is easy to find and share; any cut is noted on this page. Feel free to share the link. For the original file or a site visit, contact me.

More videos

Dara Sakor's built-up coast two minutes from the air
Official · 2 min 9 s
Dara Sakor's built-up coast two minutes from the air

2 min 9 s of official aerial footage (12 Aug 2026): factories, dormitories and rising buildings by the sea, then a low pass over a sealed road.

Where is Phase I? Three drone viewpoints, from orbit to the ground
1 min 0 s
Where is Phase I? Three drone viewpoints, from orbit to the ground

60 seconds: down from orbit to Dara Sakor, then three drone positions looking back at Phase I from the north, from the sea and from Say Phuthang Blvd. to the south.

Rings of Dara Sakor 2008–2026
2 min 58 s
Rings of Dara Sakor 2008–2026

3 minutes: one satellite image a year, from forest to a port, an airport and two golf courses, ending on Phase I.

Two golf courses in Dara Sakor
1 min 31 s
Two golf courses in Dara Sakor

90 seconds: Dara Sakor Coastal Golf Course by the bay and the Mountain Golf Course, 18 holes each, all real footage.

From the moment you land a Dara Sakor lifestyle film
Official · 1 min 55 s
From the moment you land a Dara Sakor lifestyle film

A 2-minute official film: landing, beach camps, night markets, a family by the sea at dusk. Chinese and English captions.

Cambodia's Rising Coastal Paradise the 2025 Dara Sakor festival
Official · 2 min 26 s
Cambodia's Rising Coastal Paradise the 2025 Dara Sakor festival

A 2 min 26 s official event film: jet skis, a boat parade, a road race, a cycling race, prize-giving and fireworks.

Want to see the land, or talk?

Sources: F-153. Prices and terms are governed by the formal sales contract; this page is not investment advice.

田
Tian Sisuo 田思索
Based in Sihanoukville, Cambodia for 8 years, trained in land resource management. Since June 2026, Sales Director of Soksan Sakor Land (Residential Land) Phase I (30 ha) at Dara Sakor. GIS, remote sensing and spatial data are my professional base; I build the tools I need to sell land myself.
Share
Comments