What Is Actually Built in Dara Sakor Today? A Dated Photo Inventory
As of 2026-11, most of Dara Sakor is still under construction. In use today: Dara Sakor International Airport with its Phnom Penh flights, two 18-hole golf courses, the completed VET pool villas (hotel) by the sea, and an air-supported dome hall. The roads of Soksan Sakor Land (Residential Land) Phase I (30 ha) are built and open to traffic, with a gravel surface and asphalt still to come, and the plots themselves are open land today (F-131, F-026, F-112, F-152). Each item below carries its shooting date. It records only what was filmed, not plans.
Airport and flights: in use
- Dara Sakor International Airport has a 3,200 m runway and the Phnom Penh route is open (F-131); it completed its first flight on 2024-12-26 (F-025). Official footage of that day is on the video page Dara Sakor International Airport first flight ceremony, 2024.
- As of 2026-11, the Phnom Penh to Dara Sakor flight runs one round trip every Friday and Sunday and can be booked (F-136).
- Interior footage of the terminal, shot by the group's planning department on 2026-08-02, is in the footage library; I can send the original.
Two golf courses: in use
The coastal course and the mountain course are both 18 holes (F-026). According to the group's 2026 promotional materials, the coastal course opened in 2014 and the mountain course in 2016 (F-026). On my drone flight of 2025-12-02 I filmed the road between the mountain course and Phase I and the construction sites along it. Opening hours and services follow the courses' current announcements (F-026).
VET pool villas (hotel): completed
The VET pool villas (hotel) by the sea are complete, the most established high-end villa area in Dara Sakor today (F-112). The group planning department's footage from 2026-01 includes one overhead shot of the whole area: white villas, pools, a jetty and an island in the distance. This is a joint development with VET Group and is not offered for sale (F-112).
Air-supported dome hall: in use
On 2026-08-17 I flew a drone over the dome hall. Cars were parked along the road outside, DARA SAKOR was printed on the membrane, and a meeting was under way inside with the seats full. That is what I filmed that day. The hall's floor area, capacity and other figures: not yet collected.
Phase I: the road is open, the land is still empty
From my own records and the company's site records, the timeline is:
- 2026-07-21: paving of Phase I's main road began (my on-site post).
- 2026-08-05 and 2026-08-19: drone flights. A red-earth road runs through woodland, excavators are working, and the area around plots A23 and A35 is a site being levelled.
- 2026-08-14: clearing of the 30 hectares was close to complete (post).
- 2026-08-31: gravel roads and clearing and levelling were complete, water and power supply continued to advance, and the gatehouse, billboards and survey stakes were going in at the same time (post).
- 2026-10-23: all 28 planned roads in Phase I are built and open to traffic, with a gravel surface and no asphalt yet; the asphalt date is not set (F-152).
If you come today, you can drive into Phase I and stand on the plot you chose, but there is no house on it (F-112).
Eighteen years from space
To see how this coast grew year by year, watch Rings of Dara Sakor, 2008–2026: one satellite image per year, each labelled with its year.
Next step: the footage you care about
Every item above has original footage. Tell me which one you want to see (airport, golf, villa area, or a particular plot in Phase I) and I will send you the dated original video or photos:
- Telegram: @Free_skyer
- WhatsApp / phone: +855 71 232 9999
- WeChat: sirui521
Sources: airport and flights F-131, F-025, F-136; golf F-026; VET villa area and Phase I status F-112; Phase I roads F-152. Dates come from drone file names, the group planning department's footage folder dates, and my own post dates. Images show work in progress and do not indicate the delivery state of any plot.
Frequently asked questions
Is Dara Sakor finished?
What is in use today?
What is the state of Phase I?
Is there footage with dates?
When did the airport open?
Related videos
- Rings of Dara Sakor2008–2026
- Turning above Phase Ibuilt-up blocks, forest and site roads
- Two golf coursesin Dara Sakor
Related topics
More questions
- How Much Is Land in Dara Sakor? Soksan Sakor Land (Residential Land) Phase I (30 ha): 170 sqm and 500 sqm Price List
- Is Qixinghai the Same Place as Dara Sakor? Who Is the Developer?
- Can Foreigners Buy Land in Cambodia? What a 99-Year Long-Term Leasehold Right Is
- How to Get to Dara Sakor: Phnom Penh Flight Times, Driving and Sihanoukville
- How to Buy Land at Soksan Sakor Land (Residential Land) Phase I (30 ha): Steps, Payment and Transfer Rules
- Who Is Tian Sisuo? Sales Director, Soksan Sakor Land (Residential Land) Phase I (30 ha), Dara Sakor