Dara Sakor Reflections · Video

Turning above Phase I
built-up blocks, forest and site roads

A drone turns once above Phase I: finished blocks on one side, forest still being opened up on the other.

By Tian Sisuo Length 22 s Date 2026-11-05
22 s

Source: Aerial footage by Coastal City Development Group · shot 12 Aug 2026 · reposted by Tian Sisuo, sales director, Soksan Sakor Land Phase I

Short answer

Aerial footage from Coastal City Development Group's files, shot on 12 Aug 2026 with the camera inside the Phase I outline: the drone turns from the factory buildings and blocks of the built-up coast to forest and site roads, the hills beyond, and back to the built-up area and the sea. Silent, 22 s.

What the footage shows

In 22 seconds the drone turns slowly on the spot. From 0:00 it faces the built-up coast, with factory buildings and rows of blocks; from 0:06 it swings to woodland with site roads through the trees; from 0:12 hills lie beyond and the road runs on through the forest; from 0:16 it comes back round to the built-up area and the sea. There are no captions or marks, and no sound.

This is the group's official aerial footage from 12 August 2026, shot from inside the Phase I outline and shown as released. It answers the most direct question a buyer has: standing above Phase I, what is around it? Note that the built-up area in the picture is outside the Phase I boundary, and Phase I itself is still land being levelled. For the price of Phase I land, see Phase I land prices.

Chapters

tap a time to jump

  1. Built-up coast: factories and blocks
  2. Forest and site roads
  3. Hills and forest roads
  4. Back to the built-up area and sea

Transcript

Silent aerial footage with no narration; the chapter notes below serve as the text of the film.

About the footage

FAQ

Is Dara Sakor the same place as Qixinghai (七星海)?
Yes. 达拉沙果 is now the standard Chinese name, matching Dara Sakor in English, តារាសាគរ in Khmer and the highway signs. 七星海 (Qixinghai), seen in some of the group's films, is the former name and is left as it appears in the original.
Is Phase I built yet?
No. Phase I is at the stage of site levelling and internal roads, with no finished buildings. The finished buildings, shops and golf courses seen in the footage are nearby facilities outside the Phase I boundary.
Can I see footage of one particular plot?
Yes. Send me the plot number on Telegram, WhatsApp or email and I will send you footage of that plot. You can also find it by number in the Dara Sakor land sales system.

More videos

Site roads near Phase I from the forest to the works
Official · 54 s
Site roads near Phase I from the forest to the works

54 s of official aerial footage (5 Aug 2026): along a red-earth site road through the forest, past working vehicles, to levelled land and the coast.

A red-earth road through the forest near Phase I
Official · 16 s
A red-earth road through the forest near Phase I

16 s of official aerial footage (5 Aug 2026): looking down on a red-earth site road through the forest, vehicles at work, sealed road at the far end.

A curve, an embankment and cleared plots road works near Phase I
Official · 22 s
A curve, an embankment and cleared plots road works near Phase I

22 s of official aerial footage (5 Aug 2026): a curving site road, stone and embankment, cleared plots and working vehicles.

From land to sea a pan near Phase I
Official · 23 s
From land to sea a pan near Phase I

23 s of official aerial footage (5 Aug 2026): from tall and curved buildings and greenery, across the works and the main road, to the coast and islands.

Where is Phase I? Three drone viewpoints, from orbit to the ground
1 min 0 s
Where is Phase I? Three drone viewpoints, from orbit to the ground

60 seconds: down from orbit to Dara Sakor, then three drone positions looking back at Phase I from the north, from the sea and from Say Phuthang Blvd. to the south.

Rings of Dara Sakor 2008–2026
2 min 58 s
Rings of Dara Sakor 2008–2026

3 minutes: one satellite image a year, from forest to a port, an airport and two golf courses, ending on Phase I.

Want to see the land, or talk?

Sources: F-153. Prices and terms are governed by the formal sales contract; this page is not investment advice.

田
Tian Sisuo 田思索
Based in Sihanoukville, Cambodia for 8 years, trained in land resource management. Since June 2026, Sales Director of Soksan Sakor Land (Residential Land) Phase I (30 ha) at Dara Sakor. GIS, remote sensing and spatial data are my professional base; I build the tools I need to sell land myself.
Share
Comments