Dara Sakor Reflections · Video

From land to sea
a pan near Phase I

Turn your head from the land towards the sea above Phase I: buildings, roads, sea and islands in turn.

By Tian Sisuo Length 23 s Date 2026-11-05
23 s

Source: Aerial footage by Coastal City Development Group · shot 5 Aug 2026 · reposted by Tian Sisuo, sales director, Soksan Sakor Land Phase I

Short answer

Aerial footage from Coastal City Development Group's files, shot on 5 Aug 2026: near Soksan Sakor Land Phase I the drone pans from the land side towards the sea (about 118°, by telemetry) — tall and curved buildings and greenery, then the works and the main road, then the coastline and the islands offshore. Silent, 23 s.

What the footage shows

In 23 seconds the drone pans slowly from the land side towards the sea. From 0:00 tall and curved buildings with greenery beside them; from 0:08 it sweeps over the works and a main road; from 0:16 it settles on the coastline, with islands visible offshore, and the film ends there. No captions, no sound.

It was filmed on 5 August 2026 and comes from Coastal City Development Group's official files, shown as released. The file is named "land 180°", but the drone's telemetry shows a turn of about 118°. It answers what a buyer wants to know: what the view towards the sea looks like from near Phase I. The buildings are outside the Phase I boundary and are not described as handed over. For Phase I land and prices, see Phase I land prices.

Chapters

tap a time to jump

  1. Tall and curved buildings, greenery
  2. The works and the main road
  3. Coast and islands

Transcript

Silent aerial footage with no narration; the chapter notes below serve as the text of the film.

About the footage

FAQ

Is Dara Sakor the same place as Qixinghai (七星海)?
Yes. 达拉沙果 is now the standard Chinese name, matching Dara Sakor in English, តារាសាគរ in Khmer and the highway signs. 七星海 (Qixinghai), seen in some of the group's films, is the former name and is left as it appears in the original.
Is Phase I built yet?
No. Phase I is at the stage of site levelling and internal roads, with no finished buildings. The finished buildings, shops and golf courses seen in the footage are nearby facilities outside the Phase I boundary.
Who made this, and can I share it?
It is official footage from Coastal City Development Group, the developer and operator of Dara Sakor, reposted here so it is easy to find and share; any cut is noted on this page. Feel free to share the link. For the original file or a site visit, contact me.

More videos

Site roads near Phase I from the forest to the works
Official · 54 s
Site roads near Phase I from the forest to the works

54 s of official aerial footage (5 Aug 2026): along a red-earth site road through the forest, past working vehicles, to levelled land and the coast.

A red-earth road through the forest near Phase I
Official · 16 s
A red-earth road through the forest near Phase I

16 s of official aerial footage (5 Aug 2026): looking down on a red-earth site road through the forest, vehicles at work, sealed road at the far end.

A curve, an embankment and cleared plots road works near Phase I
Official · 22 s
A curve, an embankment and cleared plots road works near Phase I

22 s of official aerial footage (5 Aug 2026): a curving site road, stone and embankment, cleared plots and working vehicles.

Turning above Phase I built-up blocks, forest and site roads
Official · 22 s
Turning above Phase I built-up blocks, forest and site roads

22 s of official aerial footage (12 Aug 2026): a turn above Phase I showing the built-up coast, forest roads, hills and sea.

Where is Phase I? Three drone viewpoints, from orbit to the ground
1 min 0 s
Where is Phase I? Three drone viewpoints, from orbit to the ground

60 seconds: down from orbit to Dara Sakor, then three drone positions looking back at Phase I from the north, from the sea and from Say Phuthang Blvd. to the south.

Rings of Dara Sakor 2008–2026
2 min 58 s
Rings of Dara Sakor 2008–2026

3 minutes: one satellite image a year, from forest to a port, an airport and two golf courses, ending on Phase I.

Want to see the land, or talk?

Sources: F-153. Prices and terms are governed by the formal sales contract; this page is not investment advice.

田
Tian Sisuo 田思索
Based in Sihanoukville, Cambodia for 8 years, trained in land resource management. Since June 2026, Sales Director of Soksan Sakor Land (Residential Land) Phase I (30 ha) at Dara Sakor. GIS, remote sensing and spatial data are my professional base; I build the tools I need to sell land myself.
Share
Comments