A red-earth road through the forest
near Phase I
Sixteen seconds of a red-earth road through the trees: this is how the roads around Phase I are being opened up, stretch by stretch.
Source: Aerial footage by Coastal City Development Group · shot 5 Aug 2026 · reposted by Tian Sisuo, sales director, Soksan Sakor Land Phase I
Aerial footage from Coastal City Development Group's files, shot on 5 Aug 2026 near Soksan Sakor Land Phase I: the camera looks down on a red-earth site road through the forest, vehicles driving and working along it, joining a darker sealed road at the end. Silent, 16 s.
What the footage shows
This 16-second film has one view: the drone looking straight down. From 0:00 a red-earth site road runs through the middle of the forest, vehicles driving along it; from 0:08 one end of the track meets a darker road surface, and the film ends there. It has no captions and no sound.
It was filmed on 5 August 2026 and comes from Coastal City Development Group's official files, shown as released. It answers a plain question for land buyers: what state are the roads around Phase I in right now. The picture shows only what was there that day; it does not judge the road class or mean the road is finished. For Phase I land and prices, see Phase I land prices.
Chapters
tap a time to jump
- Red-earth road and vehicles
- The track meets a sealed road
Transcript
Silent aerial footage with no narration; the chapter notes below serve as the text of the film.
About the footage
- This is the group's official footage, shown as released; the name 七星海, logos and captions in it are part of the original.
- Real drone footage with no captions or overlays; buildings and roads are as they were on the day of the flight.
- Describes the picture only; it says nothing about road class and does not mean the road is finished.
FAQ
Is Dara Sakor the same place as Qixinghai (七星海)?
Is Phase I built yet?
Who made this, and can I share it?
More videos

54 s of official aerial footage (5 Aug 2026): along a red-earth site road through the forest, past working vehicles, to levelled land and the coast.

22 s of official aerial footage (5 Aug 2026): a curving site road, stone and embankment, cleared plots and working vehicles.

23 s of official aerial footage (5 Aug 2026): from tall and curved buildings and greenery, across the works and the main road, to the coast and islands.

22 s of official aerial footage (12 Aug 2026): a turn above Phase I showing the built-up coast, forest roads, hills and sea.

60 seconds: down from orbit to Dara Sakor, then three drone positions looking back at Phase I from the north, from the sea and from Say Phuthang Blvd. to the south.

3 minutes: one satellite image a year, from forest to a port, an airport and two golf courses, ending on Phase I.
Want to see the land, or talk?
Sources: F-153. Prices and terms are governed by the formal sales contract; this page is not investment advice.