Dara Sakor Reflections · Video

Site roads near Phase I
from the forest to the works

What the roads around Phase I look like while they are being built: no music, no captions, just a drone following the track.

By Tian Sisuo Length 54 s Date 2026-11-05
54 s

Source: Aerial footage by Coastal City Development Group · shot 5 Aug 2026 · reposted by Tian Sisuo, sales director, Soksan Sakor Land Phase I

Short answer

Aerial footage from Coastal City Development Group's files, shot on 5 Aug 2026 near Soksan Sakor Land Phase I (the camera positions are within 400 m of Phase I): the drone flies steadily along a red-earth site road through the forest — working vehicles and earthworks first, then the road pushing ahead, then levelled land, the works beyond and the coast. Silent, 54 s.

Chapters

tap a time to jump

  1. Red-earth site road and vehicles
  2. The road pushes ahead
  3. Levelled land, works and coast

Transcript

Silent aerial footage with no narration; the chapter notes below serve as the text of the film.

About the footage

FAQ

Is Dara Sakor the same place as Qixinghai (七星海)?
Yes. 达拉沙果 is now the standard Chinese name, matching Dara Sakor in English, តារាសាគរ in Khmer and the highway signs. 七星海 (Qixinghai), seen in some of the group's films, is the former name and is left as it appears in the original.
Is Phase I built yet?
No. Phase I is at the stage of site levelling and internal roads, with no finished buildings. The finished buildings, shops and golf courses seen in the footage are nearby facilities outside the Phase I boundary.
Can I see footage of one particular plot?
Yes. Send me the plot number on Telegram, WhatsApp or email and I will send you footage of that plot. You can also find it by number in the Dara Sakor land sales system.

More videos

A red-earth road through the forest near Phase I
Official · 16 s
A red-earth road through the forest near Phase I

16 s of official aerial footage (5 Aug 2026): looking down on a red-earth site road through the forest, vehicles at work, sealed road at the far end.

A curve, an embankment and cleared plots road works near Phase I
Official · 22 s
A curve, an embankment and cleared plots road works near Phase I

22 s of official aerial footage (5 Aug 2026): a curving site road, stone and embankment, cleared plots and working vehicles.

From land to sea a pan near Phase I
Official · 23 s
From land to sea a pan near Phase I

23 s of official aerial footage (5 Aug 2026): from tall and curved buildings and greenery, across the works and the main road, to the coast and islands.

Turning above Phase I built-up blocks, forest and site roads
Official · 22 s
Turning above Phase I built-up blocks, forest and site roads

22 s of official aerial footage (12 Aug 2026): a turn above Phase I showing the built-up coast, forest roads, hills and sea.

Where is Phase I? Three drone viewpoints, from orbit to the ground
1 min 0 s
Where is Phase I? Three drone viewpoints, from orbit to the ground

60 seconds: down from orbit to Dara Sakor, then three drone positions looking back at Phase I from the north, from the sea and from Say Phuthang Blvd. to the south.

Rings of Dara Sakor 2008–2026
2 min 58 s
Rings of Dara Sakor 2008–2026

3 minutes: one satellite image a year, from forest to a port, an airport and two golf courses, ending on Phase I.

Want to see the land, or talk?

Sources: F-153. Prices and terms are governed by the formal sales contract; this page is not investment advice.

田
Tian Sisuo 田思索
Based in Sihanoukville, Cambodia for 8 years, trained in land resource management. Since June 2026, Sales Director of Soksan Sakor Land (Residential Land) Phase I (30 ha) at Dara Sakor. GIS, remote sensing and spatial data are my professional base; I build the tools I need to sell land myself.
Share
Comments